


Harvey Jones Channel
In spring 2022, we planted 28,000 willow stems and over 100 cottonwood poles along sculpted channels, following the removal of invasive species from the site, and resulting in the creation of about 10 acres of valuable wetland habitat adjacent to the Rio Grande.

Santa Fe River Pond Leveler Installation
December 2021 installation of a pond leveling device (also called a Beaver Deceiver) to lower the water level above a beaver dam along the Santa Fe River at Calle Debra and Paseo Real, just west of the Santa Fe Airport.