Valles Caldera Restoration
The over 50 mile long boundary fenceline surrounding the Valles Caldera National Preserve had not been maintained since the early 2000s when it was still the Baca Ranch. We are working with the Forest Service on clearing deadfall, repairing and rebuilding the boundary...
Harvey Jones Channel
In spring 2022, we planted 28,000 willow stems and over 100 cottonwood poles along sculpted channels, following the removal of invasive species from the site, and resulting in the creation of about 10 acres of valuable wetland habitat adjacent to the Rio Grande.
Santa Fe County Erosion Control
Santa Fe County, NM This erosion control project is part of a larger restoration effort on private property in Santa Fe County. For this implementation, we worked closely alongside Jan-Willem Jansens of Ecotone, who designed the treatment (original design at...
Santa Fe River Pond Leveler Installation
December 2021 installation of a pond leveling device (also called a Beaver Deceiver) to lower the water level above a beaver dam along the Santa Fe River at Calle Debra and Paseo Real, just west of the Santa Fe Airport.